You don't have javascript enabled. Good luck with that.
Pencarian
Pelayanan Air Bersih Ke Rusun Rawa Bebek Sudah Optimal

Water Supply to Rawa Bebek Flat Flows Normally

Perusahaan Daerah Air Minum (PDAM) Jaya makes sure the water service at Rawa Bebek flat, Cakung, East Jakarta is optimal.

According to the report, all pipe installation up to the reservoir has been completed

Since June 11 ago, 250 millimeter pipe along 450 meters have been installed at the flat.

Erlan Hidayat, PDAM Jaya Director, said the water has been flowed since June 11 ago.

Water Installation at Flat must Be Tested

“According to the report, all pipe installation up to the reservoir has been completed,” he said, Thursday (8/11).

He added that his side is still unable to connect the raw water pipe to the flat due to still being constructed. It will cause Non Revenue Water or water loss.

“Water stock is adequate for the flat,” he closed.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1718 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye714 personFakhrizal Fakhri
  3. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye477 personDessy Suciati
  4. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye453 personDessy Suciati
  5. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye445 personBudhi Firmansyah Surapati